1
/
of
6
Vesgantti Queen Mattress 12 Inch Innerspring Multilayer Hybrid Queen Mattress - Ergonomic Design with Memory Foam and Pocket Spring Mattresses Queen Size - Box Top Series Medium Firm Feel
Vesgantti Queen Mattress 12 Inch Innerspring Multilayer Hybrid Queen Mattress - Ergonomic Design with Memory Foam and Pocket Spring Mattresses Queen Size - Box Top Series Medium Firm Feel
Regular price
$412.95
Regular price
$764.99
Sale price
$412.95
Unit price
/
per
Tax included.
Shipping calculated at checkout.
Couldn't load pickup availability
Brand: Vesgantti
Color: Blue
Features:
- 【Vesgantti Hybrid Mattress】Vesgantti luxury multilayer foams and pocket springs support systerm provide all-round support for 7 parts of your body, while also make your body better release pressure, offering a balanced sleep experience for all sleepers
- 【Ultra Quiet】The hybrid mattress has built in hundreds of high quality independent pocket springs with excellent shock absorption and resilience, better motion isolation and lower noise, helping you to sleep peacefully
- 【Breathable and Healthy】Designed with comfortable and breathable multi-layer foams, our mattress provides good air circulation and dissipates sweat or moisture to keep your body comfy and dry when you are asleep
- 【Medium Firm Feel】Vesgantti hybrid mattress offers a medium firm feel and meets most people's sleep preferences, not too hard not too soft. You can enjoy a comfortable sleep every night by using our mattress
- 【Mattress in a Box】Vesgantti mattresses are compressed, rolled and shipped in a box, you can easily move it and set it up in your room. Note: When unwrapping the mattress, be sure to keep a safe distance, as it may expand quickly
Package Dimensions: 62.5 x 13.0 x 12.5 inches
We do not accept returns or cancel for change of mind. We only offer returns for items that are faulty or damaged.
View full details
