Skip to product information
1 of 9

Vesgantti Twin Size Mattress - 12 Inch Fiberglass-Free Hybrid | Cool Sleep Memory Foam & Pocket Springs, Medium Firm

Vesgantti Twin Size Mattress - 12 Inch Fiberglass-Free Hybrid | Cool Sleep Memory Foam & Pocket Springs, Medium Firm

Regular price $449.95
Regular price $697.99 Sale price $449.95
Sale Sold out
Tax included. Shipping calculated at checkout.
  • Individual Pocket Spring: Supported by hundreds of quality and stainless Individual pocket spring, each spring work independently to offer an all-over and average support to 7 parts of your body (Feet, legs, hips, waist, shoulders, neck, head). Excellent shock-absorption and resilience, cater your vertebral well, help adjust and correct your sleeping posture. Note: Please keep distance when opening the mattress from the plastic packing, as it may have a risk to hit back when restoring
  • Vesgantti Luxury Support System: Memory foam and pocket spring support system also provide more buffers for your body, help relieve back pain, greatly improve your sleeping quality
  • Breathable and Healthy: Ultimate luxury slow springback foam made of high density and first-class temperature-sensitive material, fiberglass-free, cooling, breathable and comfortable, can expel the steamy sweat from the contact surface between you and mattress so to keep body comfortable and dry when sleeping
  • Ultra Quiet: Built-in high quality Individual pocket spring and slow springback foam, can effectively absorb the noise and vibration caused by tossing and turning when sleep, no waking up by the noise, not disturb companion and effectively reduce your turning times, let you sleep soundly and peacefully
  • Vacuum Roll Packed: It is delivery, compressed, vacuum sealed and neatly rolled in a box. Smaller size, easy to carry. Please allow 48 hours for the mattress to fully expand after unpacking. Thickness measurement tip: the distance from the height of the fully expanded foam to the bottom of the base. Please note: once the mattress open and restore, it cannot be roll back again

mattress
mattress
mattress
mattress

Compare with Vesgantti Mattress

Luxury Hybrid Mattress
Luxury Hybrid Mattress
Buying Options
Luxury Pillowtop Mattress
Buying Options
Hybrid Mattress
Buying Options
Pillowtop Hybrid Mattress
Hybrid Mattress
Buying Options
Hybrid Mattress
Buying Options
Customer Reviews
4.4 out of 5 stars 8,333
4.2 out of 5 stars 10
4.4 out of 5 stars 62
4.5 out of 5 stars 1,204
4.4 out of 5 stars 1,862
4.3 out of 5 stars 554
4.4 out of 5 stars 213
Price
$199.99 — — — $229.99 — —
Features
Great for Back Pain Relief Great Support for Cool Sleep Pressure Relief Pressure Relief Pressure Relief Pressure Relief Pressure Relief
Material
Memory Foam+Spring Memory Foam+Spring Pocket Spring+Memory Foam Foam+Spring Pocket Spring+Memory Foam Foam+Spring Pocket Spring+Memory Foam
Firmness
Medium Medium Medium Medium Medium Medium Medium
Available Size
Twin/TwinXL/Full/Queen/King Twin/Full/Queen/King Twin/Full/Queen/King Twin/TwinXL/Full/Queen/King Twin/TwinXL/Full/Queen/King Twin/TwinXL/Full/Queen/King Twin/TwinXL/Full/Queen/King
Available Heights
8in/9in/10in/12in/14in 12in 12in 10in 10in/12in 10in/12in 10in/12in
Style
Euro Top Euro Top Pillow Top Tight Top Pillow Top Tight Top Euro Top

We do not accept returns or cancel for change of mind. We only offer returns for items that are faulty or damaged.

View full details